Home renovations are a serious task, whether you are just upgrading a room or completely restoring the whole resale HDB flat. It is worth the trouble when opting to resale hdb renovation services. A planned renovated home makes you feel more comfortable in the space. It can positively impact the return on investment when selling in the future.
Therefore, a home renovation needs time and careful planning. The persons involved in the entire home renovation planning are:
- interior designer
- contractor
- homeowner
It is always better to dive into what you are going into before you take the plunge.
Home renovation breakdown
Starting a home renovation has to have a breakdown and these are divided into three phases:
- initial planning
- site works
- hand-over
Initial planning
The homeowner works on the initial planning phase. It readies the preparations before meeting an interior designer. Visualizing the overall look of the house you hope to achieve with home renovation is also included. There are steps to work on the initial planning, such as:
- Creating mood board
- Outlining the priority list and operational requirements
- Engaging an interior designer
- Get HBD permit
Site works
The interior designer puts up the Notice of Renovation outside the flat 3 days before the renovation starts. The Notice of Renovation will not be removed for the entire period. The HBD permits the timing for two types of renovations, such as:
- General renovations
- Noisy renovations
Hand-over
The third phase of HBD renovation includes carpentry installation and general cleanup. Once the cabinets are loaded up and assembled on the site, consider the home renovation tasks 80 to 90% done. The only remaining tasks to do are to add the final coat of paint and install the lights, including the whole cleanup of the house.
Within one week of handover, the interior designer walks you through the entire place. It is time to point out areas that need simple touch-ups that most interior designers do for free.
How long does HBD renovation last?
HBD claims that renovation works for the resale flats should be completed in 1 month, from the day the permit to renovate is granted. The duration of the renovation can be extended when needed. The interior designer needs to immediately inform the HBD brand managing the flat to avoid issues.
Conclusion
The cost of renovating a HDB flat depends on the size of the unit and the materials, including the number of rooms. You can also use the renovation calculator to estimate how much it costs to renovate your purchased unit.